HUD 221(d)(4) or a bank construction loan: the trade-offs

A HUD 221(d)(4) loan is one fixed-rate, non-recourse loan that covers construction and then up to 40 years of permanent debt at up to 87% of cost (90% for affordable). A bank construction loan is usually floating-rate, shorter, lower-leverage and recourse, and has to be refinanced once the building leases up. HUD costs time up front and Davis-Bacon wages; the bank costs refinance risk at the end.

Two different products

A bank construction loan finances the build and then expects to be paid off by permanent debt once the property stabilizes. A 221(d)(4) is the permanent debt from day one: HUD insures the loan through construction and the same note carries on for up to 40 years after completion. That single difference drives most of the comparison.

Side by side

Term HUD 221(d)(4) Typical bank construction loan
Leverage Up to 87% of cost (90% affordable, assisted or Middle Income) Lower; set by the bank’s credit policy
Coverage test 1.15x market, 1.11x affordable, on stabilized income Bank-specific
Rate Fixed, locked before initial endorsement, through construction and permanent Usually floating during construction
Term Construction plus up to 40 years, fully amortizing Construction plus a short extension period
After lease-up Nothing to refinance Refinance into permanent debt (agency, HUD 223(f), life company, CMBS)
Recourse Non-recourse, bad-acts carve-outs Usually recourse or a completion and repayment guarantee
Prevailing wages Davis-Bacon applies No, unless other federal funds are involved
Insurance premium 0.25% a year; upfront MIP for each construction year None
Up-front HUD costs 0.30% application fee, 0.5% inspection fee, third-party reports Bank fees and reports
Required escrows Working capital 4% of loan (2% rehab), assurance of completion Bank-specific
Cost certification Independent CPA certifies costs Bank draw process
Processing HUD review, often two-stage, before closing Bank credit approval

HUD terms: ML 2025-03, ML 2026-01, MAP Guide chapter 3 and the 2025 MIP notice. Bank terms vary by lender and market; this column describes common features, not a specific offer.

What HUD buys you

  • No takeout risk. The rate is fixed before the first shovel. If rates rise during a two-year build, a bank borrower refinances into the higher market; a 221(d)(4) borrower does not.
  • Leverage. 87% of cost is higher than most construction lenders offer, which can reduce or replace mezzanine or preferred equity.
  • Non-recourse. Personal liability is limited to the carve-outs in the regulatory agreement’s Section 50 addendum, not repayment.
  • New categories. ML 2026-01 added a Middle Income tier at 90% and 1.11x, and ML 2026-12 made build-to-rent communities of detached houses, duplexes and triplexes eligible under 221(d)(4).

What it costs you

  • Time before closing. HUD reviews plans, costs, market and environmental reports before it issues a firm commitment. HUD does not publish an end-to-end processing time. See the timeline guide.
  • Davis-Bacon. Prevailing wages and certified payrolls change the general contractor pool and the budget. See Davis-Bacon.
  • Process during construction. HUD construction inspections, HUD-approved draws and change orders, and a final cost certification by an independent CPA.
  • Less exit flexibility. No statutory prepayment bar on 221(d)(4), but the Ginnie Mae securities funding it usually carry a penalty schedule. See HUD prepayment.

The middle path

Many sponsors build with a bank, stabilize, then refinance into a HUD 223(f), sized on value rather than cost and without Davis-Bacon. That works when the building ends up worth more than it cost and rates cooperate at lease-up. If either fails, the owner is refinancing from weakness. 223(f) vs 221(d)(4) covers the choice in detail.

Sources

  1. HUD Mortgagee Letter 2025-03, Multifamily changes in DSCR and LTV/LTC (Jan. 8, 2025)
  2. HUD Mortgagee Letter 2026-01, Middle Income Housing option for 221(d)(4) (Jan. 22, 2026)
  3. HUD MAP Guide, Handbook 4430.G, 2020 edition, sections 3.1, 3.2 and 3.3
  4. 90 FR 45789, Changes in Mortgage Insurance Premiums for FHA multifamily programs (Sept. 23, 2025)
  5. HUD Mortgagee Letter 2026-12, build-to-rent underwriting eligibility
  6. Form HUD-92466M, Regulatory Agreement for Multifamily Projects (6/18), Section 50 addendum

Checked against these sources on October 31, 2026. HUD changes program rules by Mortgagee Letter and Federal Register notice; the lender's commitment governs any loan.

Short answers

Is a HUD 221(d)(4) loan better than a bank construction loan?

For a sponsor who plans to hold, 221(d)(4) usually offers more leverage, a fixed rate locked before construction, non-recourse terms and no refinance at lease-up. A bank loan usually wins when speed matters, when the sponsor wants to sell or refinance soon after stabilization, or when Davis-Bacon wages would hurt the budget. The right answer depends on the deal.

Does a HUD construction loan require Davis-Bacon wages?

Yes. Davis-Bacon prevailing wages apply to 221(d)(4) whether HUD insures advances during construction or insures the loan on completion, with weekly certified payrolls. Off-site work and work finished before the federal nexus are excepted. A conventional bank construction loan with no federal funds carries no such requirement.

Is a 221(d)(4) loan recourse during construction?

The loan itself is non-recourse, with personal liability only for the bad acts listed in the regulatory agreement. HUD does require an assurance of completion, such as payment and performance bonds, cash or a letter of credit, and a working capital escrow, which put real money at risk during construction.

How much can a HUD construction loan cover?

Up to 87% of total development cost for a market-rate deal at a 1.15x coverage test, and 90% at 1.11x for affordable, 90%-assisted or Middle Income deals, subject also to the statutory per-unit limit. Loans of $130 million or more are sized more conservatively.

Get a quote

Tell the desk about the property. Two steps, about two minutes.

Step 1 of 2 · The deal
About the deal
Minimum loan amount is $1M. An estimate is fine.
Your contact information

Contact information

Your information goes to our capital markets desk only. It is never sold, and no lender sees your deal without your go-ahead. Submitted over an encrypted connection.

Getting commercial property financing should be easy. Now it is. Click below for a free, no obligation quote and to learn more about your loan options.

Get a quote
Call Get a quote